Home News Contact Us About EMAX  

Analytical Services
EDD
US Air Force
Bullet Arrow US Army
Bullet Arrow US EPA
Bullet Arrow US Navy
Bullet Arrow US DOE
Certifications
Bullet Arrow Facilities
Bullet Arrow Instrumentation
Bullet Arrow Laboratory Layout
Bullet Arrow News
Bullet Arrow Jobs
Bullet Arrow Testimonials
Bullet Arrow Contact Us

Projects > US Army  

United States Army

EMAX has been certified with the Army Corps of Engineers for almost 10 years.  We have supports projects in many Corps Districts including Sacramento, Louisville, Omaha, Kansas City, Baltimore, Savannah, Walla Walla just to name a few.

Summary of Army Project Experience

PROJECT

SERVICE

TAT

EDD

Benicia Arsenal, CA

Environmental Investigation for site closure.  Parameters included VOA, SVOA, metals, TPH, PAH, PCBs, and pesticides.

21 days

LCD ADR

Bruno Superfund Site, NE

VOA monitoring for remedial design.

48 hours

Client Format

Corn Husker Army Ammunition Plant (CHAAP), NE

Weekly monitoring of groundwater for VOA and explosives.

21 days

IRPIMS

Corn Husker Army Ammunition Plant (CHAAP), NE

Soil investigation and groundwater monitoring.  Over 300 water samples for 8330 and wet chemistry parameters.

21 days

IRPIMS

Detroit Arsenal, MI

Analysis of metals, 8015, 8081, 8082, 8121, 8151, and 8270.

14 days fax
28 days HC

EMAX

Dover AFB, MD

Monthly and quarterly groundwater monitoring of VOA, PAH, dissolved gases and wet chemistry parameters.

14 days

IRPIMS

Former Blaine NAD, Hastings, NE

Analysis of metals and explosives.

14 days

EMAX

Former Blaine NAD, Hastings, NE

Total environmental restoration – VOA, SVOA, metals, herbicides, TCLP, and SPLP.

21 days

Client Format

Fort AP Hill, VA

Site investigation and feasibility studies.  Analysis of soil, sediment, and water for VOA, SVOA, metals, pesticides, PCBs, and herbicides.

30 days

ERPIMS

Fort McClellan, AL

Analyzed approximately 4000 samples to date. 

21 days

Client Format

Fort Ord / Range 39, CA

Site assessment – analysis of soils for VOA, SVOA, explosives, perchlorate and metals.

21 days

LCD ADR

Ft. George G. Mead, MD

Semiannual monitoring of 30 wells in landfill for appendix constituents and an extensive list of wet chemistry parameters.

21 days

ERPIMS

Ft. Knox, Central Wash Racks, KY

Waste characterization by – metals, pesticides, VOA, SVOA, and 8310.

21 days

Client Format

Hamilton, NAF, CA

Analyzed for metals, pesticides, PCBs, and PAHs, low detection limits necessary.

21 days

ERPIMS

Hawthorne SMWU B-29, NV

Site investigation and remedial design of explosive contaminated site.

10 days

NEDTS / EDF

Indiana Army Ammunition Plant (INAAP), IN

Long term project for site investigation, feasibility studies, and remedial design, including analysis of soil, sediment, groundwater, surface water, of VOA, SVOA, PCBs, metals, and explosives.  Quarterly groundwater and surface water monitoring of similar parameters.

28 days

IRDMIS

Jefferson Proving Grounds, IN

Site investigation and remedial design.  Analysis of soil and water for VOA, SVOA, metals, explosives, pesticides, and PCBs.

21 days

ERPIMS

Kincheloe AFB, MI

Groundwater monitoring of metals, VOA, dissolved gases, and wet chemistry parameters.

21 days

ERPIMS

LF26, Hamilton, AAF, CA

Site assessment analysis – analysis of soils by method 8260, 8270, and metals.

5 days, 14 days

ITEMS

LSAAP, TX

Analyzed for metals, VOA, SVOA, 8330, hexavalent chromium.

21 days

ERPIMS

NOP Site
Mead, NE

Monthly groundwater monitoring of 10 wells for 8260, 8270, and wet chemistry.

7 day
14 days

EMAX

Oakland USARC, CA

Site investigation and remedial design.  Analysis of VOA, SVOA, metals, and TPH.

21 days

EMAX

Offutt AFB, NE

Weekly monitoring of ground water for VOA and explosives.

21 days

IRPIMS

Shaw AFB, NE

Monthly NPDES monitoring of discharge.  Analysis of metals, VOA, wet chemistry parameters.

30 days

Client Format

Titan 1-A, CA

Monthly monitoring of 20 wells for VOA, metals, and wet chemistry parameters.

21 days

IRPIMS 4.0

Tracy Sharp Depot, CA

Quarterly groundwater monitoring of 130 wells for VOA, SVOA, pesticides, and herbicides.

10 days

EDMS

USAR & AFR Center, CA

Site investigation and remedial design.  Analysis of VOA, SVOA, metals, and TPH.

28 days

EMAX

VAAP, TN

Analysis of explosives, metals, and anions.

21 days

Client Format

Vernal, UT

Quarterly ground water monitoring of VOA and TPH.

14 day,  fax 20 day,  HC

Client Format

 

 

© EMAX Laboratories, Inc. Terms of Use

Website Design and Developed by the Applied Research Center at Florida International University